> ## Documentation Index
> Fetch the complete documentation index at: https://installerguides.lunarenergy.com/llms.txt
> Use this file to discover all available pages before exploring further.

# Bridge as Service Disconnect

<Steps>
  <Step>
    Remove grid supply lugs (top center) by unscrewing 2x M6 bolts (T25/T27). Save bolts.

    <img src="https://mintcdn.com/lunarenergy/H7D9yAHVhY12Cksz/images/bridge/service-disconnect-lugs.png?fit=max&auto=format&n=H7D9yAHVhY12Cksz&q=85&s=3b4f0b58364ef17cf9f8a20b812590e0" width="300" data-path="images/bridge/service-disconnect-lugs.png" />
  </Step>

  <Step>
    Remove and discard the plastic retainer (T25).
  </Step>

  <Step>
    Insert main breaker by engaging bottom tabs into relay cover and rotating top into position.
  </Step>

  <Step>
    Secure breaker tabs with saved M6 bolts. Torque: 75 in-lbs (9 N-m).
  </Step>

  <Step>
    Secure top of breaker assembly with manufacturer bolt or saved screw. Torque: 30 in-lbs (3 N-m).
  </Step>

  <Step>
    Apply Service Disconnect label adjacent to the breaker.

    <img src="https://mintcdn.com/lunarenergy/H7D9yAHVhY12Cksz/images/bridge/service-disconnect-explode.png?fit=max&auto=format&n=H7D9yAHVhY12Cksz&q=85&s=9fdcefd861fd53bc04f6d5ae7165dc80" width="500" data-path="images/bridge/service-disconnect-explode.png" />
  </Step>
</Steps>
