> ## Documentation Index
> Fetch the complete documentation index at: https://installerguides.lunarenergy.com/llms.txt
> Use this file to discover all available pages before exploring further.

# ESS Location Requirements

## Clearance Requirements

<img src="https://mintcdn.com/lunarenergy/ur4SEtH7YEWeM2cq/images/ess-clearance.png?fit=max&auto=format&n=ur4SEtH7YEWeM2cq&q=85&s=b1af2cb1fb3424b55f836863b646d78f" alt="ESS Clearance" width="1999" height="1908" data-path="images/ess-clearance.png" />

| Requirement                                                                                                         | Specification                                                                                                                                                                                                  |
| :------------------------------------------------------------------------------------------------------------------ | :------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| Minimum clearance on sides                                                                                          | 6 in (15.2 cm) to all obstructions. <Note>      Additional clearance recommended from hot air sources to avoid power limiting.  </Note>                                                                        |
| Minimum clearance above system                                                                                      | 2.5 in (15 cm)                                                                                                                                                                                                 |
| Minimum wall space for installation                                                                                 | 36.4 in (92 cm) wide. Height depends on quantity of DC ESS units.                                                                                                                                              |
| Maximum height above ground/floor to bottom of ESS for rotary switch on inverter (RSID) to be 6’7” from grade       | L2-ESS-10kWh: 50.4 in (128 cm)<br />L2-ESS-15kWh: 39.7 in (101 cm)<br />L2-ESS-20kWh: 29.1 in (74 cm)<br />L2-ESS-20kWh+(1) LE-DC-UNIT: 18.5 in (47 cm)<br />L2-ESS-20kWh+(2) LE-DC-UNIT: 7.8 in (20 cm)<br /> |
| Maximum height above ground/floor to bottom of ESS where external RSID is field installed less than 6’7” from grade | No limit                                                                                                                                                                                                       |
| Minimum clearance in front of battery                                                                               | Abide by local code                                                                                                                                                                                            |
| Minimum clearance to doors and windows directly entering the dwelling unit (N/A to attached or detached garages)    | Abide by local code                                                                                                                                                                                            |
| Minimum room size for indoor installation                                                                           | 283 cu ft. (8.01 m<sup>3</sup>)                                                                                                                                                                                |

## Distance between Components

| Connection                                   | Max Distance   | Wire Gauge                                                        |
| :------------------------------------------- | :------------- | :---------------------------------------------------------------- |
| Inverter to Maximizer Hub                    | 200 ft (61 m)  | 12 AWG – 4 AWG                                                    |
| Inverter to Bridge (AC)                      | 95 ft (29.5 m) | 8 AWG – 4 AWG                                                     |
| Inverter to Bridge or MSA Controller (Comms) | 95 ft (29.5 m) | Cat5e, Cat6, Cat6a, or 14–22 AWG (shielded, twisted or untwisted) |

## Top Alignment

Use the following measurements to align the ESS, Lunar Bridge, and conduits from the top of the inverter cover.

<img src="https://mintcdn.com/lunarenergy/BVoXFmcUUh_Rv2zY/images/top-alignment-measurements.png?fit=max&auto=format&n=BVoXFmcUUh_Rv2zY&q=85&s=febaf8adbfba5af3be56538737ffe059" alt="Top Alignment Measurements" width="3924" height="1977" data-path="images/top-alignment-measurements.png" />

| Measurement                                              | Value            |
| :------------------------------------------------------- | :--------------- |
| From Inverter Top Cover to Top of Inverter Bracket       | 19 mm (3/4")     |
| From Inverter Top Cover to Lower Conduit Entry Center    | 269 mm (10 5/8") |
| From Inverter Top Cover to Bridge Mount Bolt Hole Center | 92 mm (3 5/8")   |

| Configuration | From Inverter Top Cover to Top of Lowest Battery Bracket | From Inverter Lower Conduit Entry Center to Top of Lowest Battery Bracket |
| :------------ | :------------------------------------------------------- | :------------------------------------------------------------------------ |
| 10 kWh        | 586 mm (23 1/8")                                         | 316 mm (12 1/2")                                                          |
| 15 kWh        | 857 mm (33 3/4")                                         | 587 mm (23 1/8")                                                          |
| 20 kWh        | 1128 mm (44 3/8")                                        | 858 mm (33 3/4")                                                          |
| 25 kWh        | 1399 mm (55 1/8")                                        | 1129 mm (44 1/2")                                                         |
| 30 kWh        | 1670 mm (65 3/4")                                        | 1400 mm (55 1/8")                                                         |

## Network & Connectivity

Reliable internet connection via Wi-Fi (**2.4 GHz only**) or Ethernet is required for firmware updates and warranty compliance. Cellular (LTE CAT M1) is available as a backup connection method.

<Warning>
  Failure to maintain a persistent internet connection may reduce the warranty terms. See the [Lunar Warranty](https://documents.lunarenergy.com/lunar-warranty) for details.
</Warning>
