Documentation Index
Fetch the complete documentation index at: https://installerguides.lunarenergy.com/llms.txt
Use this file to discover all available pages before exploring further.
Wall Bracket Anchoring
2x4 Wooden Studs| Method | Stud Requirements | Fastener Requirements |
|---|---|---|
| Surface Mount | Min. 1 stud (center or off-center) | 1x fastener (min. 1/4” dia) into stud (min 2” depth) 1x fastener into wall with >=30lb anchor |
| Semi-Flush | 2 adjacent studs 14.5” apart(16” on center) | 4x #8 fasteners (2 per side) into studs (min 1” depth) |
Surface Mount
Dry fit bracket
Dry fit bracket over stud. Mark wall at bottom of Bridge, then measure up 22” to position bracket.
Semi-Flush Mount
Follow Wall Bracket Anchoring instructions.Enclosure must extend at least 3” from wall surface for door clearance.
Door must be capable of opening >= 90°.


